Fault Analysis of Eastern Grid Network

Student: Chibuzor Chukwuma (Project, 2025)
Department of Electrical /Electronics Engineering
Federal Polytechnic, Nekede, Imo State


Abstract

Fault in electrical power System can occur as a result of three phase short circuit, single line to ground, two phases to ground short circuit and line to line fault. These very faults, Definitely, give rise to fault' current. Fault level calculation studies in power system, is required to know the fault currents in other to provide for necessary information for the selection Of switch gears, circuit breakers, setting of relays and stability system operation. NEPLAN (Network Planning) in power system analysis is a software developed by BCP (Bursorello ± Cott + Partner) Switzerland used ford system modeling and analysis.

Keywords
Fault Short Circuit Stability System Operation Network Planning Power System Analysis System Modeling Analysis.