Solar Power Installation in Mechanical Staff Offices in the 1000lt Area
Student: OGHENEOCHUKO CHRISTIAN ADJOGBE (Project, 2025)
Department of Mechanical Engineering
Delta State University, Abraka, Delta State
Abstract
ABSTRACT This report document outlines the setup of the installation of solar panel system in the mechanical staff offices in the 1000Lt Area with the goal of decreasing dependence on the power grid and offering a sustainable and cost-efficient energy source. It covers the planning, design, and installation stages, including the choice of solar panels, inverters, batteries, and electrical needs. Additionally, it includes information on the system's performance, such as energy production and efficiency. The findings highlight solar energy's potential as a feasible substitute for conventional electricity sources and offer valuable perspectives on the future of solar energy utilization.
Keywords
For the full publication, please contact the author directly at: adjogbe.ogheneochuko@delsu.edu.ng
Filters
Institutions
- Covenant Polytechnic, Aba, Abia State 1
- Covenant University, Canaan Land, Ota, Ogun State 4
- Crawford University of Apostolic Faith Mission Faith City, Igbesa, Ogun State 2
- Crescent University, Abeokuta, Ogun State 1
- Cross Rivers University of Technology, Calabar, Cross Rivers State 142
- Delta State Polytechnic, Ogwashi-Uku, Delta State 11
- Delta State Polytechnic, Otefe, Delta State 12
- Delta State University, Abraka, Delta State 139
- Ebonyi State University, Abakaliki, Ebonyi State 17
- Edo University, Iyamho, Edo State 10