Upgrading of 1kva Solar System to 3kva at Power Laboratory in Department of Electrical/electronic Engineering Technology
Student: Anas Bashir Rogo (Project, 2025)
Department of Education and Electrical/Electronics Technology
Kano State Polytechnic, Kano, Kano State
Abstract
ABSTRACT This project presents design, of the upgrading of solar system from form 1kva to 3KVA. The project construction/installation provides an alternative source of power supply via solar energy system to furnish power the power laboratory of eElectrical Engineering department. The whole project comprises of 4parts;: Solar module, charge/controller, inverter and load.
Keywords
For the full publication, please contact the author directly at: anasbashirrogo0940@gmail.com
Filters
Institutions
- Kebbi State University of Science and Technology, Aliero, Kebbi State 6
- Kenule Benson Saro-Wiwa Polytechnic, Bori, Rivers State 18
- Kogi State Polytechnic, Lokoja, Kogi State 4
- Kogi State University, Anyigba 2
- Kwara State College of Health Technology, offa, Kwara State 9
- Kwara State Polytechnic, Ilorin, Kwara State 20
- Kwara State University, Malete, Ilorin, Kwara State 13
- Ladoke Akintola University of Technology, Ogbomoso, Oyo State 39
- Lagos State Poly, Ikorodu, Lagos State 2
- Lagos State University, Ojo, Lagos State 7