Assessment, Maintenance and Upgrade of Solar Based Power Supply in Examination Office
Student: Taiye David Oladotun (Project, 2025)
Department of Electrical /Electronics Engineering
Kaduna Polytechnic, Kaduna
Abstract
This project talks about the assessment, maintenance and upgrade of solar installation in the examination office. By improving the efficiency and reliability through the use of a 3.2KVA inverter, 60A/24V charge controller, two 220Ah/12V batteries in series. The goal is to optimize the solar installation performance in alignment with the examination office energy requirement.
Keywords
For the full publication, please contact the author directly at: taiyeoladotun7@gmail.com
Filters
Institutions
- Federal Polytechnic, Mubi, Adamawa State 20
- Federal Polytechnic, Nasarawa, Nasarawa State 59
- Federal Polytechnic, Nekede, Imo State 53
- Federal Polytechnic, offa, Kwara State 18
- Federal Polytechnic, Oko, Anambra State 8
- Federal School of Biomedical Engineering, (LUTH), Idi-Araba, Lagos State 1
- Federal School of Surveying, Oyo, Oyo State 7
- Federal University of Agriculture, Abeokuta, Ogun State 19
- Federal University of Petroleum Resources, Effurun, Delta State 77
- Federal University of Technology Akure, Ondo State 23