Upgrade of 3.5kv to 10kv Solar System at Robotics Laboratory of Department of Electrical/electronic Engineering Technology
Student: Mustapha Ismail Adam (Project, 2025)
Department of Electrical /Electronics Engineering
Kano State Polytechnic, Kano, Kano State
Abstract
This project presents design and upgrading of solar system form 3.5kva to 10kva. The project construction/installation provides an alternative source of power supply via solar energy system to furnish the power laboratory of Electrical Engineering department. The whole project comprises of four (4) parts; Solar module, charge/controller, inverter and load.
Keywords
For the full publication, please contact the author directly at: ismailadammustapha@gmail.com
Filters
Institutions
- Landmark University, Omu-Aran, Kwara State 1
- Lead City University, Ibadan, Oyo State 1
- Lens Polytechnic, offa, Kwara State. 214
- Madonna University, Elele, Rivers State 20
- Madonna University, Okija, Anambra State 2
- Mcpherson University, Seriki Sotayo, Ogun State 1
- Michael and Cecilia Ibru University, Owhrode, Delta State 1
- Michael Okpara University of Agriculture, Umudike 43
- Michael Otedola Col of Primary Educ. Epe, Lagos (affl To University of Ibadan) 8
- Modibbo Adama University, Yola, Adamawa State 15