Upgrade of 3.5kv to 10kv Solar System at Robotics Laboratory of Department of Electrical/electronic Engineering Technology
Student: Khadija Umar Aliyu (Project, 2025)
Department of Electrical /Electronics Engineering
Kano State Polytechnic, Kano, Kano State
Abstract
ABSTRACT The Robotics Laboratory in the Department of Electrical/Electronic Engineering Technology currently utilizes a 3.5 kV solar power system to supply part of its electrical needs. However, limitations in transmission distance, system losses, and expandability have prompted the need for an upgrade to a 10 kV medium-voltage solar system. This project proposes to redesign and implement this upgrade by integrating a high-voltage solar inverter, a suitably rated transformer, enhanced earthing and protection systems, and optimized cable routing to ensure safety, reliability, and performance.
Keywords
For the full publication, please contact the author directly at: khadijaaliyuumar46@gmail.com
Filters
Institutions
- Kebbi State University of Science and Technology, Aliero, Kebbi State 6
- Kenule Benson Saro-Wiwa Polytechnic, Bori, Rivers State 18
- Kogi State Polytechnic, Lokoja, Kogi State 4
- Kogi State University, Anyigba 2
- Kwara State College of Health Technology, offa, Kwara State 9
- Kwara State Polytechnic, Ilorin, Kwara State 20
- Kwara State University, Malete, Ilorin, Kwara State 13
- Ladoke Akintola University of Technology, Ogbomoso, Oyo State 39
- Lagos State Poly, Ikorodu, Lagos State 2
- Lagos State University, Ojo, Lagos State 8