Upgrade of 3.5kv to 10kv Solar System at Robotics Laboratory of Department of Electrical/electronic Engineering Technology
Student: Khadija Umar Aliyu (Project, 2025)
Department of Electrical /Electronics Engineering
Kano State Polytechnic, Kano, Kano State
Abstract
ABSTRACT The Robotics Laboratory in the Department of Electrical/Electronic Engineering Technology currently utilizes a 3.5 kV solar power system to supply part of its electrical needs. However, limitations in transmission distance, system losses, and expandability have prompted the need for an upgrade to a 10 kV medium-voltage solar system. This project proposes to redesign and implement this upgrade by integrating a high-voltage solar inverter, a suitably rated transformer, enhanced earthing and protection systems, and optimized cable routing to ensure safety, reliability, and performance.
Keywords
For the full publication, please contact the author directly at: khadijaaliyuumar46@gmail.com
Filters
Institutions
- Covenant Polytechnic, Aba, Abia State 1
- Covenant University, Canaan Land, Ota, Ogun State 4
- Crawford University of Apostolic Faith Mission Faith City, Igbesa, Ogun State 2
- Crescent University, Abeokuta, Ogun State 1
- Cross Rivers University of Technology, Calabar, Cross Rivers State 142
- Delta State Polytechnic, Ogwashi-Uku, Delta State 11
- Delta State Polytechnic, Otefe, Delta State 13
- Delta State University, Abraka, Delta State 139
- Ebonyi State University, Abakaliki, Ebonyi State 17
- Edo University, Iyamho, Edo State 10