Upgrade of 3.5kv to 10kv Solar System at Robotics Laboratory of Department of Electrical/electronic Engineering Technology
Student: Khadija Umar Aliyu (Project, 2025)
Department of Electrical /Electronics Engineering
Kano State Polytechnic, Kano, Kano State
Abstract
ABSTRACT The Robotics Laboratory in the Department of Electrical/Electronic Engineering Technology currently utilizes a 3.5 kV solar power system to supply part of its electrical needs. However, limitations in transmission distance, system losses, and expandability have prompted the need for an upgrade to a 10 kV medium-voltage solar system. This project proposes to redesign and implement this upgrade by integrating a high-voltage solar inverter, a suitably rated transformer, enhanced earthing and protection systems, and optimized cable routing to ensure safety, reliability, and performance.
Keywords
For the full publication, please contact the author directly at: khadijaaliyuumar46@gmail.com
Filters
Institutions
- Sokoto State University, Sokoto, Sokoto State 42
- St. Albert The Great Major Seminary, Abeokuta. (affl. To University of Benin) 1
- Sule Lamido University, Kafin Hausa, Jigawa State 4
- Tai Solarin University of Education, Ijagun, Ogun State 18
- Tansian University, Oba, Anambra State 1
- Taraba State University, Jalingo, Taraba State 32
- Temple-Gate Polytechnic, Osisioma, Abia State 1
- The Oke-Ogun Polytechnic, Saki, Oyo State 6
- The Polytechnic, Ibadan, Oyo State 13
- THOMAS ADEWUMI UNIVERSITY, OKO-IRESE, KWARA STATE 1