Upgrade of 3.5kv to 10kv Solar System at Robotics Laboratory of Department of Electrical/electronic Engineering Technology
Student: Khadija Umar Aliyu (Project, 2025)
Department of Electrical /Electronics Engineering
Kano State Polytechnic, Kano, Kano State
Abstract
ABSTRACT The Robotics Laboratory in the Department of Electrical/Electronic Engineering Technology currently utilizes a 3.5 kV solar power system to supply part of its electrical needs. However, limitations in transmission distance, system losses, and expandability have prompted the need for an upgrade to a 10 kV medium-voltage solar system. This project proposes to redesign and implement this upgrade by integrating a high-voltage solar inverter, a suitably rated transformer, enhanced earthing and protection systems, and optimized cable routing to ensure safety, reliability, and performance.
Keywords
For the full publication, please contact the author directly at: khadijaaliyuumar46@gmail.com
Filters
Institutions
- Al-Hikmah University, Ilorin, Kwara State 2
- AL-ISTIQAMAH UNIVERSITY, SUMAILA, KANO STATE 1
- Al-Qalam University, Katsina, Katsina State 5
- Alex Ekwueme Federal University, Ndufu-Alike, Ebonyi State 87
- Alvan Ikoku College of Education, Imo State, (Affl To Univ of Nigera, Nsukka) 11
- Ambrose Alli University, Ekpoma, Edo State 479
- Anambra State College of Health Technology, Obosi, Anambra State 1
- Auchi Polytechnic, Auchi, Edo State 503
- Auchi Polytechnic, Auchi, Edo State. (affl To Nnamdi Azikiwe University, Awka) 3
- Audu Bako College of Agriculture Danbatta, Kano, Kano State 54