Upgrade of 3.5kv to 10kv Solar System at Robotics Laboratory of Department of Electrical/electronic Engineering Technology
Student: Khadija Umar Aliyu (Project, 2025)
Department of Electrical /Electronics Engineering
Kano State Polytechnic, Kano, Kano State
Abstract
ABSTRACT The Robotics Laboratory in the Department of Electrical/Electronic Engineering Technology currently utilizes a 3.5 kV solar power system to supply part of its electrical needs. However, limitations in transmission distance, system losses, and expandability have prompted the need for an upgrade to a 10 kV medium-voltage solar system. This project proposes to redesign and implement this upgrade by integrating a high-voltage solar inverter, a suitably rated transformer, enhanced earthing and protection systems, and optimized cable routing to ensure safety, reliability, and performance.
Keywords
For the full publication, please contact the author directly at: khadijaaliyuumar46@gmail.com
Filters
Institutions
- Binyaminu Usman Polytechnic, Hadijia, Jigawa State 3
- Borno State University, Maiduguri, Borno State 15
- Bowen University, Iwo, Osun State 1
- Chukwuemeka Odumegwu Ojukwu University, Uli, Anambra State 255
- College of Agriculture and Animal Science, Mando Road, Kaduna, Kaduna State 1
- College of Agriculture, Science and Technology, Lafia, Nasarawa State 8
- College of Education, Akwanga (affl To Ahmadu Bello Univ, Zaria) 1
- College of Education, Eha Amufu, (Affliliated To Unn), Enugu State 1
- College of Education, Warri (Affiliated To Delta State Uni, Abraka), Delta State 1
- College of Health Technology, Calabar, Cross River State 1