Upgrade of 3.5kv to 10kv Solar System at Robotics Laboratory of Department of Electrical/electronic Engineering Technology
Student: Khadija Umar Aliyu (Project, 2025)
Department of Electrical /Electronics Engineering
Kano State Polytechnic, Kano, Kano State
Abstract
ABSTRACT The Robotics Laboratory in the Department of Electrical/Electronic Engineering Technology currently utilizes a 3.5 kV solar power system to supply part of its electrical needs. However, limitations in transmission distance, system losses, and expandability have prompted the need for an upgrade to a 10 kV medium-voltage solar system. This project proposes to redesign and implement this upgrade by integrating a high-voltage solar inverter, a suitably rated transformer, enhanced earthing and protection systems, and optimized cable routing to ensure safety, reliability, and performance.
Keywords
For the full publication, please contact the author directly at: khadijaaliyuumar46@gmail.com
Filters
Institutions
- Redeemers University, Ede, Osun State 4
- Rhema University, Aba, Abia State 11
- Rivers State University of Science and Technology, Port Harcourt, Rivers State 3
- RIVERS STATE UNIVERSITY, PORT HARCOURT, RIVERS STATE 13
- Rufus Giwa Polytechnic, Owo, Ondo State 2
- Saadatu Rimi College of Edu, Kumbotso, Kano State (affiliated To Abu, Zaria) 1
- Salem University, Lokoja, Kogi State 4
- School of Health Information Mgt (Uch, Ibadan), Oyo State 5
- School of Health Information Mgt, Oau Teaching Hospital, Ile-Ife, Osun State 30
- Skyline University Nigeria, Kano, Kano State 2