Upgrade of 3.5kv to 10kv Solar System at Robotics Laboratory of Department of Electrical/electronic Engineering Technology
Student: Khadija Umar Aliyu (Project, 2025)
Department of Electrical /Electronics Engineering
Kano State Polytechnic, Kano, Kano State
Abstract
ABSTRACT The Robotics Laboratory in the Department of Electrical/Electronic Engineering Technology currently utilizes a 3.5 kV solar power system to supply part of its electrical needs. However, limitations in transmission distance, system losses, and expandability have prompted the need for an upgrade to a 10 kV medium-voltage solar system. This project proposes to redesign and implement this upgrade by integrating a high-voltage solar inverter, a suitably rated transformer, enhanced earthing and protection systems, and optimized cable routing to ensure safety, reliability, and performance.
Keywords
For the full publication, please contact the author directly at: khadijaaliyuumar46@gmail.com
Filters
Institutions
- Novena University, Ogume, Delta State 1
- Nuhu Bamalli Polytechnic, Zaria, Kaduna State 7
- Nwafor Orizu College of Education, Nsugbe, Anambra State 1
- Obafemi Awolowo University, Ile-Ife, Osun State 15
- Oduduwa University, Ipetumodu, Osun State 9
- Ogun State College of Health Technology, Ilese-Ijebu, Ogun State 1
- Ogun State Institute of Tech(formerly Gateway Ict Poly), Igbesa, Ogun State 4
- Olabisi Onabanjo University, Ago-Iwoye, Ogun State 38
- Ondo State University of Medical Sciences, Laje Road, Ondo, Ondo State 1
- Osun State College of Education, Ila-Orangun 1