Upgrade of 3.5kv to 10kv Solar System at Robotics Laboratory of Department of Electrical/electronic Engineering Technology
Student: Khadija Umar Aliyu (Project, 2025)
Department of Electrical /Electronics Engineering
Kano State Polytechnic, Kano, Kano State
Abstract
ABSTRACT The Robotics Laboratory in the Department of Electrical/Electronic Engineering Technology currently utilizes a 3.5 kV solar power system to supply part of its electrical needs. However, limitations in transmission distance, system losses, and expandability have prompted the need for an upgrade to a 10 kV medium-voltage solar system. This project proposes to redesign and implement this upgrade by integrating a high-voltage solar inverter, a suitably rated transformer, enhanced earthing and protection systems, and optimized cable routing to ensure safety, reliability, and performance.
Keywords
For the full publication, please contact the author directly at: khadijaaliyuumar46@gmail.com
Filters
Institutions
- University of Ilorin, Kwara State 403
- University of Jos, Jos, Plateau State 19
- University of Lagos 18
- University of Maiduguri ( - Elearning), Maiduguri, Borno State 3
- University of Maiduguri, Borno State 109
- University of Nigeria, Nsukka, Enugu State 270
- University of Port Harcourt Teaching Hospital, Port Harcourt , River State 6
- University of Port-Harcourt, Rivers State 177
- University of Uyo, Akwa Ibom State 209
- Usmanu Danfodio University, Sokoto, Sokoto State 245