Upgrade of 3.5kv to 10kv Solar System at Robotics Laboratory of Department of Electrical/electronic Engineering Technology
Student: Khadija Umar Aliyu (Project, 2025)
Department of Electrical /Electronics Engineering
Kano State Polytechnic, Kano, Kano State
Abstract
ABSTRACT The Robotics Laboratory in the Department of Electrical/Electronic Engineering Technology currently utilizes a 3.5 kV solar power system to supply part of its electrical needs. However, limitations in transmission distance, system losses, and expandability have prompted the need for an upgrade to a 10 kV medium-voltage solar system. This project proposes to redesign and implement this upgrade by integrating a high-voltage solar inverter, a suitably rated transformer, enhanced earthing and protection systems, and optimized cable routing to ensure safety, reliability, and performance.
Keywords
For the full publication, please contact the author directly at: khadijaaliyuumar46@gmail.com
Filters
Institutions
- Adeseun Ogundoyin Polytechnic, Eruwa, Oyo State 1
- Adeyemi College of Education, Ondo State. (affl To Oau, Ile-Ife) 68
- Ahmadu Bello University, Zaria, Kaduna State 101
- Air Force Institute of Technology (Degree), Kaduna, Kaduna State 11
- Air Force Institute of Technology, Kaduna, Kaduna State 2
- Akanu Ibiam Federal Polytechnic, Unwana, Afikpo, Ebonyi State 6
- Akwa Ibom State University, Ikot-Akpaden, Akwa Ibom State 53
- Akwa Ibom State College of Edu, Afaha-Nsit (Affl To Uni Uyo), Akwa Ibom State 2
- AKWA-IBOM STATE POLYTECHNIC (IEI), IKOT-OSURUA, AKWA IBOM STATE 41
- Akwa-Ibom State Polytechnic, Ikot-Osurua, Akwa Ibom State 32