Upgrade of 3.5kv to 10kv Solar System at Robotics Laboratory of Department of Electrical/electronic Engineering Technology
Student: Khadija Umar Aliyu (Project, 2025)
Department of Electrical /Electronics Engineering
Kano State Polytechnic, Kano, Kano State
Abstract
ABSTRACT The Robotics Laboratory in the Department of Electrical/Electronic Engineering Technology currently utilizes a 3.5 kV solar power system to supply part of its electrical needs. However, limitations in transmission distance, system losses, and expandability have prompted the need for an upgrade to a 10 kV medium-voltage solar system. This project proposes to redesign and implement this upgrade by integrating a high-voltage solar inverter, a suitably rated transformer, enhanced earthing and protection systems, and optimized cable routing to ensure safety, reliability, and performance.
Keywords
For the full publication, please contact the author directly at: khadijaaliyuumar46@gmail.com
Filters
Institutions
- Ekiti State University 58
- Ekiti State University, Ado-Ekiti, Ekiti State 882
- Elizade University, Ilara-Mokin, Ondo State 100
- Emmanuel Alayande College of Education, Oyo. (affl To Ekiti State Univ) 2
- Enugu State Polytechnic, Iwollo, Enugu State 4
- Enugu State University of Science and Technology, Enugu, Enugu State 29
- Evangel University, Akaeze, Ebonyi State 2
- FCT COLLEGE OF EDUCATION, ZUBA ,( AFFILIATED TO ABU, ZARIA), FCT-ABUJA 5
- Federal College of Agricultural Produce Tech, Hotoro Gra Ext, Kano, Kano State 2
- Federal College of Educ. (Special), Oyo, Oyo State (Aff To Uni. Ibadan) 10